诗词屋>英语词典>variances翻译和用法

variances

英 [ˈveərɪənsɪz]

美 [ˈvɛriənsɪz]

n.  变化幅度; 差额
variance的复数

柯林斯词典

  • PHRASE (与…)不一致,相矛盾
    If one thing isat variance withanother, the two things seem to contradict each other.
    1. Many of his statements were at variance with the facts...
      他的说法有很多和事实不符。
    2. This idealistic concept is at variance with reality.
      这种理想主义的观念和现实相矛盾。
  • N-VAR 差异;不同
    Thevariancebetween things is the difference between them.
    1. ...the variances in the stock price.
      股票价格的变化
    2. ...total revenue variance.
      总收入的差异

双语例句

  • These variances are defined by the variable geometries and the usable thickness of the casework and walls.
    这些变化决定于可变的几何形状和使用厚度个案和墙壁。
  • The budget variance analysis column can be set up on how you review the budget variances.
    预算差异分析这一列可以根据您查看预算差异的方式来设置。
  • The engine has electronically controlled fuel injection and ignition which adjust automatically to cater for variances in fuel quality.
    ROCAM发动机有电子控制燃油喷射和迎合燃油质量变化的自动调整点火正时。
  • Secondly, the numerical characteristics such as mathematical expections, variances and covariances are obtained.
    其次,研究了如此得到概率分布的数学期望、方差和协方差等数字特征。
  • Reported on variances in quarterly costing reports.
    在季度费用报告中报告变动。
  • A method for testing whether the multiple populations have a certain kind of different variances is also given.
    后者则可以在方差不满足齐性的条件下,对多个正态母体是否具有某种不同的均值进行检验。
  • In addition to process variation, supply power operating temperature are also possible on-chip variances.
    除了工艺上的变异之外,电源电压以及操作温度也可能造成芯片上变异。
  • In engineering, the use of control loops is common for managing systems that have high variances in their measurements.
    在工程中,控制循环的使用对测量中拥有高方差的系统的管理是很平常的。
  • Variance analysis is a systematic process of comparing actual costs and standard costs, identifying variances, and interpreting the source of each variance.
    成本差异分析是比较实际成本和标准成本、确认差异及解释差异的根源。
  • This is possible if variances are identified and informed actions are taken at major design milestones.
    这是可能的,如果差额确定,并通知采取行动的主要设计的里程碑。